and
higher productivity in any academic institution. Federal University of
Technology Minna like many other institutions of learning in a developing
country like Nigeria is faced with inadequate electricity supply. In addition,
the demand for electricity in Gidan Kwano campus of Federal University of
Technology Minna has increased rapidly due to the growing population, increased
infrastructure and social conditions in the university. To address the shortage
of electricity in the university, large investment is required. Accurate load
forecasting will ensure that these INVESTMENTS do not waste and at the same
time help distribute electricity effectively in the university campus. It will
also uncover inefficiencies in the system as well as determine where savings
can be made. When load forecasting is not accurately done, it will lead to
improper planning and sizing of the network.
Website: http://www.arjonline.org/engineering/american-research-journal-of-electrical-engineering/
Website: http://www.arjonline.org/engineering/american-research-journal-of-electrical-engineering/
No comments:
Post a Comment